widget top left stemmen
  • Follow Royal Haskoning on Twitter
  • Follow Royal Haskoning on YouTube

Hoogenweg bridge

The new drawbridge over the canal Almelo

The Haandrik is the third in a total of five bridges to be renovate in order to make the canal suitable for larger vessels.

 

The design consists of two single balances sustained by an open cantilever column placed on either side of the bridge

 

Data

Client

Province of Overijssel

 

Size

Length 30m, Width 7m, Passage 10,5m

 

Period

2011 – 2013

 

Place

Marienberg, the Netherlands

 

Disciplines

Architecture

Structural Design

Project management

 

Projectteam

Jorge Moura, Sven Spierings, Carien ten Cate, Jan Brouwer, Karel Vis, Mario Mies

Text/