Hoogenweg bridge
The new drawbridge over the canal Almelo
The Haandrik is the third in a total of five bridges to be renovate in order to make the canal suitable for larger vessels.
The design consists of two single balances sustained by an open cantilever column placed on either side of the bridge
Data
Client
Province of Overijssel
Size
Length 30m, Width 7m, Passage 10,5m
Period
2011 – 2013
Place
Marienberg, the Netherlands
Disciplines
Architecture
Structural Design
Project management
Projectteam
Jorge Moura, Sven Spierings, Carien ten Cate, Jan Brouwer, Karel Vis, Mario Mies




