Pedestrian bridge southern ringroad Zaanstad
The missing link
In the city of Zaanstad a new pedestrian bridge has been erected across the southern ringroad. The arch bridge forms the missing link in a family of bridges that have previously been designed by us. Althogether this bridge is our fith bridge in Zaanstad, with a sixth one coming up soon.
Data
Client
Municipality Zaanstad
Budget
€ 4.000.000
Surface
Length 90 meter, width between handrails 2,5 meter
Period
2006 – 2010
Place
Zaanstad, The Netherlands
Disciplines
Architecture
Project Management
Construction Design
Projectteam
Joris Smits, René Rijkers en Frank Sengers




