Betuwe Infrastructure
A Masterplan Design has been drafted in which all elements of the Betuweroute railway (structural works, noise barriers, overhead wires, service buildings) are combined into integrated designed principles. The Masterplan is based on facilitating heavy carriage of goods and dynamic trade. The basis of the design is to optimise costs, landscape and ecology. Much attention has been paid to light, openness, good finishing and with safe pedestrian underpasses.
Data
Client
ProRail, Projectorganisatie Betuweroute
Budget
Construction costs:
€ 5.000.000.000
Period
1992 - 2005
City
Nederland
(Maasvlakte - Zevenaar)
Disciplines
Architecture
Environment
Licenses
Cost management
(de VOF Grontmij - De Weger & in cooperation with Holland Railconsult)
Projectteam
P.D. Bronder with H. van Os en A. Rongen, M.P. Baauw




